Re: 2024 Opening Day Roster
Posted: Wed Mar 27, 2024 12:11 pm
Just wondering Bobster? How far do you live from the Francis Scott Key Bridge>
It's a 25 minute drive from my house. I've rarely used the bridge since I don't have much need to go to the section of Baltimore at the other end.Wildwoodcoach wrote: ↑Wed Mar 27, 2024 12:11 pm Just wondering Bobster? How far do you live from the Francis Scott Key Bridge>
Thank for the update. Yes, it a shame. I hate to think what would have happened if it had been during rush hourBobster wrote: ↑Wed Mar 27, 2024 12:33 pmIt's a 25 minute drive from my house. I've rarely used the bridge since I don't have much need to go to the section of Baltimore at the other end.Wildwoodcoach wrote: ↑Wed Mar 27, 2024 12:11 pm Just wondering Bobster? How far do you live from the Francis Scott Key Bridge>
The beltway (695) circles Baltimore and was originally open ended on the east side. So you could only take 695 so far in either direction and it was a long ride from one end to the other. The bridge connected the 2 ends in 1977 making the beltway a circle. With the bridge out, traffic will be heavy from one end of 695 to the other. It will also greatly increase traffic in the 2 tunnels under the harbor. But trucks and campers with propane or any hazmat cannot go thru the tunnels. So traffic is going to be a mess for the foreseeable future.
It's very sad about the construction workers who were killed. The ship issued a mayday and police prevented traffic from getting on the bridge just in time.
I'll have to come up with a different game plan to drive to NC to visit my son and his family. I hated the ride around/through Baltimore and DC already, and it will be worse for the forseeable future. But its worth it to see them, for sure.Bobster wrote: ↑Wed Mar 27, 2024 12:33 pmIt's a 25 minute drive from my house. I've rarely used the bridge since I don't have much need to go to the section of Baltimore at the other end.Wildwoodcoach wrote: ↑Wed Mar 27, 2024 12:11 pm Just wondering Bobster? How far do you live from the Francis Scott Key Bridge>
The beltway (695) circles Baltimore and was originally open ended on the east side. So you could only take 695 so far in either direction and it was a long ride from one end to the other. The bridge connected the 2 ends in 1977 making the beltway a circle. With the bridge out, traffic will be heavy from one end of 695 to the other. It will also greatly increase traffic in the 2 tunnels under the harbor. But trucks and campers with propane or any hazmat cannot go thru the tunnels. So traffic is going to be a mess for the foreseeable future.
It's very sad about the construction workers who were killed. The ship issued a mayday and police prevented traffic from getting on the bridge just in time.